Types of Roofs

blog-shingles.jpg

Shingle Roof

images-2.jpeg

Tile Roof

Unknown-3.jpg

Metal Roof

Unknown-4.jpg

Flat Roof

PROCESS:

​

-Tear-off the existing roof

 

-Replace rotten plywood (if necessary)

 

-Re-nail plywood with 2 1/2 inch nails

 

 -Install 30 pound asphaltic paper with asphalt roofing roll with tin tag and nails 1 ¼

 

-Install Timberline GAF Shingles

 

-Install all LED pipe, drip edge 3/3 and valley metal

 

-Sweep entire yard, including shrubs, with magnet to find and remove all old nails and new screws

 

-Remove all debris from premises

​

SHINGLE1.png
SHINGLE3.png
SHINGLE4.png
SHINGLE2.png
SHINGLE5.png

PROCESS:

​

-Tear-off the existing roof (including all materials; 30LB roll, 90LB, tiles, lead pipe boots, galvanized metal vent stacks, and valley metal)

 

-Replace rotten plywood (if necessary)

 

-Re-nail plywood with 2 1/2 inch nails

 

 -Install 30 pound asphaltic paper with asphalt roofing roll with tin tag and nails 1 ¼

 

-Hot mop 90LB or polystick

​

-Install tiles with foam A and foam B

 

-Install all LED pipe, drip edge 3/3 and valley metal

​

-Install galvanized metal 26 gauge flashing

​

-Flashing white Epoxy Paint

 

-Sweep entire yard, including shrubs, with magnet to find and remove all old nails and new screws

 

-Remove all debris from premises

TILE1.png
TILE2.png
TILE3.png
TILE4.png

PROCESS:

​

-Tear-off the entire existing roof (including all materials; 30LB roll, 90LB roofing tiles, lead pipe boots, galvanized metal vent stacks, and valley metal) down to the wood roof deck

​

- Replace rotten plywood (if necessary)

​

- Re Nail plywood with 2 ½ inch nails

​

- Install 30LB roofing roll with tin tag and nails 1 ¼

​

- Install GAF versa shield fire barrier 

​

- Install Standing Seam metal panel

​

- Sweep entire yard, including shrubs, with magnet to find and remove all old nails and

new screws

​

- Remove all debris from premises

PROCESS:

 

-Tear-off the entire existing roof (including all materials, Base Sheet 75LB roll roofing, R-20 roofing roll, Cap sheet, lead pipe boots, galvanized metal vent stacks, and valley metal)

​

-Replace all the rotten plywood

​

-Re nail plywood with 2 ½ inch nails

​

-Install newly-felted roof deck 75 pound with nails 1 1/4 inch and tin tag

​

-Install R-20

​

-Solidly hot-mop newly-felted roof deck with premium single-ply cap sheet roll roofing

​

-Install drip edge 3/3” gooseneck and all flashing.

​

-Sweep entire yard, including shrubs, with magnet to find and remove all old nails and new screws, Remove all debris from premises

Stone-2-626x300.jpg
Charcoal-626x300.jpg
White-626x300.jpg
Gallery-Blue-626x300.jpg
flatroofvictory.png
modified-bitumen-1024x484.jpg
rubber-membrane-1024x576.jpg
Tan-626x300.jpg
TILE5.png